Construction is one of the industries with a long history and the largest scope in the world. In Vietnam, despite experiencing the Covid-19 pandemic, the market demand for townhouse construction is forecasted to still have a high growth rate because most of them are self-built houses and are less sensitive to short-term changes in the economic environment. There are many researches and solutions proposed to improve labor productivity, reduce costs or shorten the project schedule. However, it is very difficult to satisfy all three factors at the same time. To solve this problem, the simulation approach is considered one of the most effective methods. Using Stroboscope simulation, this study records the actual construction time of the column workers at the construction site, thereby calculating the probability distributions and modeling the implementation process. The research results will help construction managers observe and evaluate potential conflicts or problems, such as resource allocation, number of workers, etc., and then make effective solutions to reduce construction time and increase labor productivity
Tin cùng chuyên mục:
Evaluating the behavior of architectural pylons of cable-stayed bridges
A Novel Feature Selection Framework to Deal with Outliers in SHM Problems
A few problems with the electric charging station design for Vietnam’s urban road network
Calculate lightweight concrete aggregates for constructing bridges