In modern cities, high-rise buildings were built more and more with limited land area. Therefore, the basement is the way out to increase underground space to solve that above matters. However, the deformation and stabilization of soil around need to be controlled during the excavation process in basement construction. Beside that, decreasing the water table is also the reason to make deformation of underground. The paper is focus to analyse the changing of soil around and find the best way to control the during constuction process in Ho Chi Minh area.